Sharepoint 2013 Upgrade Required


Background
- When migrating a SharePoint 2010 content database to upgrade to SharePoint 2013, you need to hook it to an existing web application, obviously. However, most of the time your DB to migrate will include a root site (situated at the path “/” on that web application).
- When migrating a SharePoint 2010 content database to upgrade to SharePoint 2013, you need to hook it to an existing web application, obviously. However, most of the time your DB to migrate will include a root site (situated at the path “/” on that web application).
SharePoint 2013 was installed and updated with patches that give you the version 15.0.4433.1506. After all the server install is complete, you will notice that the Servers in the Farm displayes “Upgrade Available”, as well as following warning “To get more detailed information about the local upgrade status, run: stsadm.exe -o localupgradestatus”
When you follow above steps or look up the Upgrade Status screens on the Central administration, everything looks good, yet the farm status continues to show, Upgrade Available.
Sharepoint 2013 Upgrade To 2016
Getting 'Upgrade Required' error message in SharePoint 2013? Well, Ideally, We have to run the SharePoint Products Configuration Wizard on the server (s) right after installing the service pack/patches. In Windows Server 2012, SharePoint updates are part of Windows Server Update. Hi All, i have an issue with Sharepoint 2013 where it is reporting that some Databases are too old and a upgrade is required. I have run Psconfig.exe -cmd upgrade. It's expected that if it's happening to a farm that the Upgrade Required could go away on it's own over a few days. If being patient doesn't work, running psconfig up to three times could make it go away. If that's not sufficient there's a strong indication that a cache is stale and a MS case is required to resolve.

Issue
I did not face any functional issues but was just annoyed by the status warnings.
Solution
Sharepoint Upgrade Required
Restart IIS